HDD with support of PIPE THRUSTER DN 1050
The Challenge In the municipality of Polverigi, “Località Pacetti”, the construction of a pipeline was commissioned as part of the project Iesi - Recanati DN 1050 (42"). Since the preliminary phases of operational study for the realization of the work, it emerged that...
Hydraulic connection of the S. Osvaldo and Lison basins
The Challenge Within the six lots which make up the large 13.1 million euro irrigation project of the Eastern Veneto Remediation Consortium, included in the National Rural Development Plan (PSRN), the second lot consists of the hydraulic connection of the basin...
DN 42 “steel pipeline in parallel with DN 8” F.O.
Challenge The company Anese has been awarded a contract for the construction of a crossing with the HDD technique for laying gas pipelines in Cornegliano Laudense in the province of Lodi. This project represented a major challenge for the company, which had to...
Securing the main conduct of aqueduct of Romagna Acque
Challenge the company Anese was charged by Romagna Acque for securing the main conduct of the aqueduct of Romagna on Meldola-Monte Casale, between “La Coppina” and “Forbaiola”. The final project consisted of a bypass tract with a steel pipeline of DN 1400 mm diameter...
Securing of pressurized steel conduct under a landslide area, Matera, Italy
Challenge Anese was called to carry out a variant of a steel pipeline under pressure, in the municipality of Matera, in order to restore the conduct that has been discovered, in some places, because of ground erosion. The main weaknesses encountered were: A complex...
Pipeline, One shot, Alessandria
Challenge The work commissioned to Anese consisted in making 2 lines of pipes with the diameter of 300 mm, with a horizontal directional drilling method (HDD), on the gas pipeline, with a total length of 3086 meters. It was essential to be able to carry out the TOC at...
“Project Mose” – Connection from Arsenale to Isola Nuova
Challenge Anese Srl successfully managed to install two pipelines in parallel containing optic fiber, under the Venice lagoon at the total distance of 4.750m. In 2014, Anese Srl awarded the contract to the Ministry of Infrastructure and Transport for the construction...
Multiple underpass of the river “Fine”
Challenge The aim of the work was to move the pipes connected to an industrial complex containing fluids of various kinds, so you don’t have to intervene on the bridge on which they were laid. The present geological situation was essentially composed of cohesive...