by Marco Berti | Jan 18, 2021 | CASE STUDIES
The Challenge In the municipality of Polverigi, “Località Pacetti”, the construction of a pipeline was commissioned as part of the project Iesi – Recanati DN 1050 (42″). Since the preliminary phases of operational study for the realization of the work, it...
by Marco Berti | Jul 30, 2020 | CASE STUDIES
The Challenge Within the six lots which make up the large 13.1 million euro irrigation project of the Eastern Veneto Remediation Consortium, included in the National Rural Development Plan (PSRN), the second lot consists of the hydraulic connection of the basin...
by Marco Berti | Sep 11, 2018 | CASE STUDIES
Challenge The company Anese has been awarded a contract for the construction of a crossing with the HDD technique for laying gas pipelines in Cornegliano Laudense in the province of Lodi. This project represented a major challenge for the company, which had to...
by Marco Berti | Jan 24, 2018 | CASE STUDIES
Challenge the company Anese was charged by Romagna Acque for securing the main conduct of the aqueduct of Romagna on Meldola-Monte Casale, between “La Coppina” and “Forbaiola”. The final project consisted of a bypass tract with a steel pipeline of DN 1400 mm diameter...
by Marco Berti | Dec 19, 2017 | CASE STUDIES
Challenge Anese was called to carry out a variant of a steel pipeline under pressure, in the municipality of Matera, in order to restore the conduct that has been discovered, in some places, because of ground erosion. The main weaknesses encountered were: A complex...
by Marco Berti | Dec 4, 2017 | CASE STUDIES
Challenge The work commissioned to Anese consisted in making 2 lines of pipes with the diameter of 300 mm, with a horizontal directional drilling method (HDD), on the gas pipeline, with a total length of 3086 meters. It was essential to be able to carry out the TOC at...